WATERLINE IMPROVEMENTS- EXCELSIOR SPRINGS, MO
Project Overview
As part of the City’s five-year bond program to improve water and wastewater systems, McClure provided survey, design, and construction-phase services to improve their water distribution system by replacing the existing waterlines. Replacement sections of the city involved in the project included Henrie Street and parts of the downtown area with approximately 9,365 LF of 6-inch and 8-inch PVC waterline and all associated appurtenances.
Project Highlights:
- Replaced 9,365 LF with 6” and 8” (PVC) waterline
- East End waterline included 19,750 LF of 12” waterline and high service pump station with ground level storage tanks
- Beverly Chute included 6,020 LF of 8” & 6” waterlines
- 69 Highway included 6,500 LF of 16” waterline