On October 4th, 2018, the City of Maquoketa tasked McClure to perform engineering services associated with the design, bidding and construction administration of the Runway 15/33 Lighting Rehabilitation at the Maquoketa Municipal Airport.
Runway 15/33 is equipped with a Medium-Intensity Runway Edge Lighting system (MIRL) to define the pavement edges. This system was approximately 30 years old. The cable for the lighting system is direct buried, exposing the wiring to the elements and potential animal interference. The existing lighting system includes stake mounted lights which requires constant maintenance. Frequent power outages and mowing the airfield is a constant struggle with the already damaged stake mounted lights.
After hearing the frustrations from the Airport, McClure assisted the City complete a grant application for federal funding to remove and update the edge lighting system. The primary elements of the project included the following:
• Installation of Concrete Base Mounted MIRL System
• Installation of New Cabling (2in PVC conduit system)
• Installation of Concrete Collars on all Base Mounted Lights
• Removal & Replacement of REIL on Runway 33 End and 15 End
• Installation of a Bare Counterpoise Conductor System
• Installation of Two Lighted Wind Cones
• Removal & Replacement of Constant Current Regulator
• Removal & Replacement of PAPI System on Runway 33 End and 15 End
• Remove & Replace L-854 Radio Control Equipment
• Installation of Rotating Beacon Mounted on New Tipdown Pole
• Installation of Runway Hold Position Guidance Signs
• Remove & Replace PAPI 15 & 33 Contactors
• Remove & Replace Beacon Hand/Off/Auto Switch
• Remove & Replace 100A Circuit Breaker 20 SP. – PAPI/REIL Power Panel
• Remove 30 SP. Circuit Breaker & Replace with 42 SP. Circuit Breaker
Runway 15/33 is equipped with a Medium-Intensity Runway Edge Lighting system (MIRL) to define the pavement edges. This system was approximately 30 years old. The cable for the lighting system is direct buried, exposing the wiring to the elements and potential animal interference. The existing lighting system includes stake mounted lights which requires constant maintenance. Frequent power outages and mowing the airfield is a constant struggle with the already damaged stake mounted lights.
After hearing the frustrations from the Airport, McClure assisted the City complete a grant application for federal funding to remove and update the edge lighting system. The primary elements of the project included the following:
• Installation of Concrete Base Mounted MIRL System
• Installation of New Cabling (2in PVC conduit system)
• Installation of Concrete Collars on all Base Mounted Lights
• Removal & Replacement of REIL on Runway 33 End and 15 End
• Installation of a Bare Counterpoise Conductor System
• Installation of Two Lighted Wind Cones
• Removal & Replacement of Constant Current Regulator
• Removal & Replacement of PAPI System on Runway 33 End and 15 End
• Remove & Replace L-854 Radio Control Equipment
• Installation of Rotating Beacon Mounted on New Tipdown Pole
• Installation of Runway Hold Position Guidance Signs
• Remove & Replace PAPI 15 & 33 Contactors
• Remove & Replace Beacon Hand/Off/Auto Switch
• Remove & Replace 100A Circuit Breaker 20 SP. – PAPI/REIL Power Panel
• Remove 30 SP. Circuit Breaker & Replace with 42 SP. Circuit Breaker
Highlights
- McClure was able to remove existing runway lighting, retroreflective markers, vault building equipment and runway equipment and install functioning runway and taxiway edge lights, guidance signs, and completely new vault building electrical equipment.