Southwest State Street Reconstruction of Southbound Lanes
Ankeny, IA
Southwest State Street is a heavily traveled arterial roadway in Ankeny, Iowa. The existing roadway was experiencing deteriorating pavement, so the City of Ankeny hired McClure to design the reconstruction of the southbound lanes, from Southwest Ordnance Road to West First Street. The northbound lanes along this stretch had previously been reconstructed three years prior. The project included reconstruction of the existing PCC pavement, subdrain and storm sewer installation, raised PCC medians, ADA sidewalk ramps, new pedestrian push button pedestals, pavement markings, and signing.
Highlights
- $1.41 million construction project along SW State Street, which carries approximately 15,000 vehicles per day
- Developed a strategic staging plan in collaboration with the City of Ankeny and key stakeholders, including the adjacent John Deere manufacturing facility
- Maintained access to local businesses and residences throughout construction while optimizing contractor efficiency
- McClure provided full-service project delivery, including survey, preliminary and final design, bidding assistance, construction administration and inspection, and record drawings