Hub I
Gainesville, FL
Hub I is an eight-story, 180,000 square foot off-campus student housing development located near the University of Florida in Gainesville. The building includes retail and amenity spaces at the ground level, structured parking, and residential units ranging from one to five bedrooms on the upper floors. Designed to meet the lifestyle needs of college students, the project offers a modern urban living experience with a full suite of amenities.
The structure consists primarily of load-bearing cold-formed steel (CFS) wall panels, open-web CFS joists, and concrete floor decks built above a concrete podium. What makes this project truly unique is the integration of a stay-in-place CFS panelized wall system that served as formwork for full-height cast-in-place concrete shear walls. This approach—one of the first of its kind in the country—allowed the lateral system, originally designed as concrete shear walls by the Engineer of Record (EOR), to continue up through the CFS-framed levels without disrupting the construction schedule. McClure, serving as the Cold-Formed Steel Specialty Engineer, led the development of these panelized systems, ensuring they could resist full fluid pressure during concrete pours while maintaining the structural and aesthetic goals of the project.
The CFS panels were prefabricated and installed on-site with precision, addressing complex challenges such as rebar spacing, embed coordination, and podium-level load transfer. Despite initial concerns about constructability, McClure’s collaborative coordination with the EOR, contractors, and fabricators ensured smooth execution in the field. The success of this approach has set a precedent for future projects, demonstrating how innovative detailing and engineering can seamlessly integrate cold-formed steel and concrete systems in mid-rise construction.
The structure consists primarily of load-bearing cold-formed steel (CFS) wall panels, open-web CFS joists, and concrete floor decks built above a concrete podium. What makes this project truly unique is the integration of a stay-in-place CFS panelized wall system that served as formwork for full-height cast-in-place concrete shear walls. This approach—one of the first of its kind in the country—allowed the lateral system, originally designed as concrete shear walls by the Engineer of Record (EOR), to continue up through the CFS-framed levels without disrupting the construction schedule. McClure, serving as the Cold-Formed Steel Specialty Engineer, led the development of these panelized systems, ensuring they could resist full fluid pressure during concrete pours while maintaining the structural and aesthetic goals of the project.
The CFS panels were prefabricated and installed on-site with precision, addressing complex challenges such as rebar spacing, embed coordination, and podium-level load transfer. Despite initial concerns about constructability, McClure’s collaborative coordination with the EOR, contractors, and fabricators ensured smooth execution in the field. The success of this approach has set a precedent for future projects, demonstrating how innovative detailing and engineering can seamlessly integrate cold-formed steel and concrete systems in mid-rise construction.
Highlights
- Among the first projects in the U.S. to utilize stay-in-place cold-formed steel (CFS) panels as formwork for cast-in-place structural concrete walls
- Integrated CFS panelized formwork to construct concrete shear walls serving as the building’s primary lateral force-resisting system
- Developed a series of innovative industry details to support the system, including solutions for embeds, wall reinforcement, bar splicing, and diaphragm integration
Discipline
Structural
Project Type
Multi-Story Mixed-Use Residential/Commercial
Client
Eisen Group, LLC